Project Details

  • Project Name :

    SNMG Shuaiba Re-routing to SNDC

Projects

Brief Scope

The scope of this project was to maximize the availability of Gas & Condensate production from SNMG and SN Shuaiba reservoir in case of non-availability of SN Shuaiba Compressor, to optimize plant flexibility/operability by rerouting SNMG and Shuaiba productions to SN Deep and SNDC respectively to reduce the dependency on SN Shuaiba Compressor and Rerouting the gas from Shuaiba Compressor to an inlet of Depletion Compressor during depletion mode.

image